Lakeside Road Watermain Replacement
Lakeside Road Watermain Replacement
Description
Lakeside Road is located within the urban community of the Town of Fort Erie within Ward# 2. The project area is located along Lakeside Street from Phillips Street to Dominion Road.
Through a risk analysis generated through the Asset Management Plan, it has been identified that this section of Lakeside Street (about 1045m) requires replacement of the existing 150mm diameter cast iron watermain including services, which was constructed between 1940 and 1959, replacement or relining of the existing 200 mm diameter asbestos cement sanitary sewer (constructed in 1973), stormwater drainage improvements and full road reconstruction.
Budget
$4,118,000
Construction Timeline
- Start of Construction – Summer of 2020
- End of Construction – TBD
Public Notice(s)
Contact Information for Project:
Ryan Maiden, Project Manager, rmaiden@forterie.ca, 905-871-1600, ext.2413
Consultant contact:
Ahmed Bhabha, P. Eng, ahmed.bhabha@ghd.com
Contractor:
TBD